J’s Flood Hope Husky – Hope, BC

Completed a design of a new onsite wastewater treatment system and disposal field to service a busy 24-hour truck stop diner convenience store and gas station in Hope. The new system replaced a malfunctioning existing system and created peace of mind for the owner/operator. The system was designed for a peak flow rate of 21,000 Lpd.

Leave a Reply